$('#arc_new_comment').hide(); $("html:not(:animated),body:not(:animated)").animate({ scrollTop: destination-0}, 300 ); It is your responsibility as the designer/architect to ensure that once your finishes are installed that the resulting space is acceptable and coordinate with your structural consultants accordingly. Archtoolbox is a Trademark of Aggregate Digital LLC. } ), and masonry (Mas.). }).appendTo(form); var action_referer = null; }); And if the wall section and interior elevations shows SSL or SFL, the builder and the supplier will give you according to whatever information that is in the contract docs. If you enjoy reading our blog as much as we enjoy writing it, that just makes our day! $(textarea).focus(function() window.location.reload(); $('#' + el).redactor({ }, OneSignal.push(function() Affiliate DisclosureThe links that lead to products on this page are affiliate links. alert(result.message); //plugins:'a11yhelp,basicstyles,bidi,blockquote,button,clipboard,colorbutton,colordialog,dialogadvtab,div,enterkey,entities,filebrowser,find,flash,font,format,forms,horizontalrule,htmldataprocessor,iframe,image,indent,justify,keystrokes,link,list,maximize,newpage,pagebreak,pastefromword,pastetext,popup,preview,print,removeformat,resize,save,smiley,showblocks,showborders,sourcearea,stylescombo,table,specialchar,tab,templates,toolbar,undo,wysiwygarea,wsc,vimeo,youtube', $("#featured_comments_section #arc_featured_comment_" + data.id + " .arc_reply_comment").remove(); var action = 'add'; $(".FeaturedComments").remove(); Be sure to check the front section of the drawing set for the abbreviations used within. arc_editor_423( $('.editor').attr('id') ); "chat-answer": { $(el).redactor({ args: ['blockquote', 'class', 'pullquote-left', 'toggle'] /* else if(status == 'block') See all Fine art. Correct me if Iam wrong, FFL refers to the level at the top surface of floor finish. This is often done on drawings where it isnt worth the time to revise them, but you still need to convey the information. TYP is simply an abbreviation for "typical.". Smith House Co. strives to build more beautiful, functional and resilient spaces which are self sustaining and harmonize with their natural surroundings. This conversation came about when I had a kick off meeting with our team lead. The list of abbreviations used in a set of architectural drawings varies from office to office. What does AFF stand for in Architecture? $(document).ready(detectOverlapping); }); } Where a typical condition is noted, it should be understood that similar conditions are the same unless specifically detailed or noted otherwise. customConfig : '', }); Reflected ceiling plans are an essential part of any set of architectural drawings. title: 'Subheading', { buttons: ['html', 'format', 'bold', 'italic', 'underline', 'lists', 'link', 'image'], Clear up any confusion by learning the different basic architectural abbreviations for drawings. "pullquote-centered": { It is something I have to get used to. alert(json.message); TOS is for the Structural drawings. { "chat-answer": { function arc_editor_423(el, extra_params) { { Of course, the nice thing about standards is that there are so many to choose from Can you ellaborate what are those variables that would affect the design, working drawings or constructability of it? $('body').append(""); return false; } if (($.client.os == 'Windows') && ($.client.browser == 'Chrome')) { if ($(parent_node).find(".ReplyComments").length > 0) type: 'GET', Do you need the fixed level to be the surface that's walked on or the structure that holds it up? the surface of the tile, not the underlay) in that room. 6. */ $(container).find(".BottomReply").hide(); removePlugins: 'liststyle,tabletools,contextmenu', skin: 'v2', }); allowedContent: 'p br b i ol ul li strong em center; a[*]{*}(*); img[*]; span[*]{*}(*); iframe[*]', $(".arc_reply_comment_box").remove(); And youll also find home appliances and control panels on this list, such as water heater (Wtr. } else What is included in exterior elevation? Variables could be: 1) room function changes, 2) slab depressions, 3) transitions between finish material, etc. linkShowAdvancedTab: false, But in construction, there could be several reference points from which a vertical dimension could be taken. "chat-question": { Home Construction Glossary AFF / Above Finish Floor, Definition of AFF / Above Finish Floor in Construction. }); minHeight: 300, type: 'POST', While SSL refers to the level at the top surface of the structural slab. Find the . } $(point).html(co.feature.text).attr("rel", 30).attr("original-title", co.feature.title); $(image).replaceWith('

'); These are the ones we have on our shelf. SFL refers to the level at the top surface of the floor screeding or concrete topping. formatting: ['p'], Above Finish Floor AFF - Above Finish Floor. if (($.client.os == 'Mac') && ($.client.browser == 'Chrome')) { $(button).replaceWith('
Flagged
'); And @ At: ACT: Acoustic Ceiling Tile: AD: Area Drain: AFF: Above Finished Floor: ALUM: Aluminum: ANOD: Anodized: BSMT: Basement: BYND: Beyond: BOT: Bottom . They're confusing, mysterious, and do nothing to help us communicate with the people we serve. } Periods. { Correct me if Iam wrong, FFL refers to the level at the top surface of floor finish. */ June 7, 2022 . $(image).replaceWith('

'); $('#StickyBanner').addClass('fixed'); title: 'Subheading', }); Check them out below. "figcaption": { } buttons: ['html', 'format', 'bold', 'italic', 'underline', 'lists', 'link', 'image'], buttons: ['html', 'format', 'bold', 'italic', 'underline', 'lists', 'link', 'image'], return false; Yes FFL is on top of any floor finshes ( ceramic tile, wood flooring, vinyl floor, granite stone, pavers, etc.). }); args: ['p', 'class', 'chat-question', 'toggle'] It ends up being very Us vs. "subheading": { } $('#' + el).redactor({ var container = $(this).parents(".Line"); { }, A.F.F. language: 'en', }, during CA stage. var referrer = $(this); lineNumbers: true, are indicated as a dimension AFF. }, 500); if(suffix != '_ios') else if(status == 'ban') FYI, I am very well versed with the processes in constructing a building as I've worked for a GC doing a design-build for years before I join the Archi firm; and took part in planning and execution of various trades from the start of the construction up to the turn-over of the project. { This is (in my experience) a holdover from CAD where there would be real problems if a drafter forgot the minus sign for negative elevations. callbacks: }, imageUpload: '/redactor/upload', You can email the site owner to let them know you were blocked. }, formattingAdd: { { var comment_modal = $("#comment_modal").clone(); } Starting with the approved FFL as it depends on many factors, then based on finish layers the structural slab level is determined SSL.When an architect starts new design he will set the FFL based on his space calculations for each floor and accordingly calculate the SSL as he already specified floor finishing materials and thicknesses.Usually our reference during construction phase is SSL based on an approved shop drawings, The Base reference for all disciplines will always be Finish Floor Level FFL. { }, resize_enabled: true, var status = $(this).attr('rel'); True, the surveyor who set the levels in the site, sets his point/ stakes based on the structural levels but this is not the case in design. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data. In many cases, the elevation of the finish floor is a benchmark elevation, with other dimensions noted as AFF or above this finish floor height. "pullquote-left": { { Here's a partial list of some of the acronyms you'll see in architectural drawings. e.preventDefault(); This is an instance where a client will purchase something, but will have the contractor install it (like appliances or closet systems). alert(json.message); { $(image).replaceWith('

'); This sounds more like a revit level set up question that a CA one. $(el).ckeditor(function(){ customConfig : '', function ban_user(point) $(reply_container).remove(); pasteBlockTags: ['ul', 'ol', 'li', 'p'], 19th-21st Century Art. { . disableNativeSpellChecker: false, var y = $(this).scrollTop(); The Value of Quality Design and Engineering on Construction Projects, The Importance of Documenting Your Project. How are your door panels going to look? dwg or . "subheading": { else { args: ['blockquote', 'class', 'pullquote-right', 'toggle'] Building architects and designers are responsible for communicating countless things about a buildings construction: where it should be located on the lot, how it should be built, what materials should be used, what it should look like, and where the MEP systems that make it function go. customConfig : '', Engineering drawing abbreviations and symbols are used to communicate and detail the characteristics of an . or G.F.I. Makes sense why I've seen it with the 100'-0" base elevation in drawings over 90 years old. Though using the sub-floor as the reference makes more sense to me, I want to make it as . suffix = (typeof suffix == "undefined")? imageUploadError: function(json, xhr) $("#arc_comment_" + data.id + ">.Top>.Right>.CommentModerate>ul>li>.HidingAction").html(co.hide.text).attr("rel", 25).attr("original-title", co.hide.title); title: 'Subheading', { }, }, success: function(data, status, xhr) { $(el).ckeditor(function() {}, { pasteInlineTags: ['strong', 'br', 'b', 'em', 'i'], }, { else if(status == 'unblock') resize_dir: 'vertical', }, function arc_remove_editor(el) { $(this).tipsy({gravity: 's'}); $(form).replaceWith($(data).html()); T.O.STEEL/B.O.DECK etc to describe structure. if (extra_params === undefined) } Is it SSL is given first then you figure out the SFL then the FFL or the other way around, FFL is set first then the SFL then the SSL? This stands for typical and means that if you see this listed once, everything else like this has the same note or dimension applied to it. if(data > '') toolbarCanCollapse: false AFF above finished floor . success: function(data, status, xhr) args: ['p', 'class', 'chat-answer', 'toggle'] This website is using a security service to protect itself from online attacks. This means that something should be provided as a separate line item as an alternate to what is otherwise drawn. title: 'Quote Centered', /* var lineCount = Math.ceil(textarea.value.length / (textarea.cols + 20)); linkShowTargetTab: false, } 2. }, $(point).show(); I agree that the Structure gets built 1st before installing the finishes. }, lineWrapping: true, var scpt = document.getElementsByTagName('script')[0]; We have grading plans and landscaping that bridge the gap between finished floor elevation at the door threshold and whatever elevation the sidewalk (for example) is at. Jordan Smith is the CEO and Founder of Smith House Company, a design+build firm based in Austin, Texas. imageUpload: function(image, json) But some architects might use their own abbreviations that arent standard or well known. $(image).replaceWith('

'); Partners in Business, Partners in Life: Architecture Couples Discuss the Ups, Downs, and In-betweens of Running a Practice Together, SCI-Arc Student Investigates How Artificial Intelligence Can Assist in 3D Modeling, Every Piece of Architecture is First a Work of Fiction; A Conversation with Ole Scheeren. Still, as much as theyre ingrained in this profession, I absolutely cant stand them. title: 'Quote Right', All rights reserved. title: 'Quote Left', }); function arc_remove_editor_423 (el) { action = 'remove'; pasteBlockTags: ['ul', 'ol', 'li', 'p'], [1] 2. @non sequitur, I worked as a CA also :) so are you saying that when you determine the bldg 1st floor level from the street level ,as required by code, you basically used or reference with SSL? It was used so that if the minus sign was forgotten or missing, there would be no issue.
David A Bednar Health, Articles W